OIL, GAS AND MINING


TRANS-ANATOLIAN GAS PIPELINE PROJECT (TANAP), MEASURING STATIONS MS3 AND MS4

Investor: TEKFEN İNŞAAT TESİSAT A.Ş.

ÇANAKKALE-EDİRNE / TÜRKİYE 2018 – 2019


ÇÖPLER GOLD MINE – SULPHIDE EXPANSION PROJECT

Investor: GAP INSAAT A.S. & ANAGOLD MADENCILIK SANAYI VE TICARET A.S.

ERZİNCAN / TÜRKİYE 2017 – 2018


KIRIKKALE 927 MW INDEPENDENT CYCLE POWER PLANT PROJECT

Investor: SAMSUNG C&T CORPORATION

KIRIKKALE / TÜRKİYE 2015 – 2017


WATAN 9E TURBINE POWER PLANT PROJECT WITH A CAPACITY OF 250 MW

Investor: ÇALIK ENERJİ A.Ş.

WATAN / TURKMENISTAN 2015 – 2016


VOLGOGRAD REFINERY – DEEP TRANSFORMATION PROJECT

Investor: YAMATA ENDUSTRIYEL A.Ş.

VOLGOGRAD / RUSSIA 2014 – 2016


TAHA 180 MW COMBINED CYCLE POWER PLANT PROJECT

Investor: BADES ELEKTRİK ÜRETİM A.Ş.

MARDİN / TÜRKİYE 2015


DERWEZE 9E TURBINE POWER PLANT DESIGN WITH A CAPACITY OF 500 MW

Investor: ÇALIK ENERJİ A.Ş.

DERWEZE / TURKMENISTAN 2014 – 2015


TOROS TARIM SULPHURIC ACID PLANT PROJECT

Investor: TEKFEN İNŞAAT TESİSAT A.Ş.

SAMSUN / TÜRKİYE 2014-2015


NAJYBIA 9E 500 MW TURBINE POWER PLANT PROJECT

Investor: ENKA TEKNİK A.Ş.

BASRAH / IRAQ 2014 – 2015


GARDABANİ COMBINED POWER PLANT PROJECT WITH A CAPACITY OF 230 MW

Investor: ÇALIK ENERJİ A.Ş.

GARDABANI / GEORGIAN 2014 – 2015


ERZİN COMBINED POWER PLANT PROJECT WITH A CAPACITY OF 900 MW

Investor: TEKFEN İNŞAAT TESİSAT A.Ş.

ERZİN-HATAY / TÜRKİYE 2012 – 2015


TÜPRAŞ İZMİT REFINERY, FUEL OIL CONVERSION PROJECT (RUP)

Investor: TEKFEN İNŞAAT TESİSAT A.Ş.

İZMİT / TÜRKİYE 2012 – 2014


AL KHAIRAT 9E 1250 MW GAS TURBINE POWER PLANT PROJECT

Investor: ÇALIK ENERJİ A.Ş.

KARBALA / IRAQ 2012 – 2014


NAINAWA 9E 750 MW TURBINE POWER PLANT PROJECT

Investor: ÇALIK ENERJİ A.Ş.

MUSUL / IRAQ 2013 – 2014


WASTE GAS RECOVERY PROJECT AT TÜPRAŞ KIRIKKALE REFINERY

Investor: ACS İNŞAAT LTD. ŞTİ.

KIRIKKALE / TÜRKİYE 2013 – 2014


ALMS MARY-2 110 kV HV CABLE INSTALLATION PROJECT

Investor: ÇALIK ENERJİ A.Ş.

MARY / TÜRKMENİSTAN 2014


GARZAN BİNEK HYDRO POWER PLANT PROJECT WITH A CAPACITY OF 5.6 MW

Investor: FERNAS İNŞAAT A.Ş.

BATMAN / TÜRKİYE 2013 – 2014


DERBANIKHAN 250 MW HYDRO POWER PLANT PROJECT

Investor: LUTHARDT GmbH

SULAYMANIYAH / IRAQ 2013


MELEK GIRLS’ DORMITORY CONSTRUCTION PROJECT

Investor: GENESİS LTD. ŞTİ

ANKARA / TÜRKİYE 2012 – 2013


TÜPRAŞ BATMAN H-509 REFINERY NEW BOILER ROOM PROJECT

Investor: SELNİKEL KLİMA CİHAZLARI A.Ş.

BATMAN / TÜRKİYE 2012 – 2013


SAS/ASAB GAS SEPARATION INSTALLATION DESIGN

Investor: TEKFEN İNŞAAT TESİSAT A.Ş.

ABUDHABI / UNITED ARAB EMIRATES 2011 – 2012


OYAK BOLU CEMENT PLANT – C11035 – BAG FILTER PROJECT WITH A CAPACITY OF 800,000 M3/S

Investor: SİNTEK MADENCİLİK LTD. ŞTİ.

BOLU / TÜRKİYE 2012


DESIGN OF A CLINKER PRODUCTION LINE AT THE VAN 3000 T/D CEMENT PLANT

Investor: FERNAS İNŞAAT A.Ş.

VAN / TÜRKİYE 2011 – 2012


43.40MW GARZAN HYDRO-ELECTRICAL POWER PLANT PROJECT

Investor: FERNAS İNŞAAT A.Ş.

BATMAN / TURKEY 2010 – 2012


TPAO WEST RAMAN GAS COMPRESSOR STATION AND STEAM INJECTION SYSTEM DESIGN

Investor: ATTİLA DOĞAN İNŞAAT VE TESİSAT A.Ş.

BATMAN / TÜRKİYE 2011 – 2012


SAMSUN OMV 870 MW POWER PLANT DESIGN WITH COMBINED CYCLE – WATER TREATMENT SYSTEM

Investor: ENPRODE LTD. ŞTİ.

SAMSUN / TÜRKİYE 2011 – 2012


120 AD GSM ROSHAN TOWER PROJECT AND AWCC

Investor: HESA İNŞAAT LTD. ŞTİ.

KABUL & KANDAHAR & KUNDUZ & MAZAR-E SHERIF / AFGHANISTAN

2010 – 2012


TÜPRAŞ İZMİT REFINERY PROJECT – TEMPORARY FIELD BUILDINGS

Investor: PRİZMA GRUP ENERJİ TAAHHÜT İNŞAAT LTD. ŞTİ.

İZMİT / TÜRKİYE 2011 – 2012


WHR POWER PLANT PROJECT AT AŞKALE CEMENT PLANT WITH A CAPACITY OF 7.5 MW

Investor: YÜKSEL İNŞAAT A.Ş.-TİTANİT LTD. ŞTİ.

AŞKALE-ERZURUM / TÜRKİYE 2010 – 2011


FY 10 AVIATION COMPLEX PROJECT

Investor: YÜKSEL İNŞAAT A.Ş.-TİTANİT LTD. ŞTİ.

MAZAR-E-SHERIF / AFGANİSTAN 2011


FERNAS PLASTER FACTORY – CALCITE GRINDING PLANT PROJECT

Investor: FERNAS ALÇI SANAYİ VE TİCARET A.Ş.

BATMAN / TÜRKİYE 2011


TÜPRAŞ BATMAN REFINERY PROJECT – F101 FOAM UNIT FOR CRUDE OIL PRODUCTION

Investor: AD DEMİREL A.Ş.

BATMAN / TÜRKİYE 2011 – 2012


ÇAYIRHAN ASH GRINDING AND SEPARATION PLANT PROJECT 9 T/H

Investor: ÇAYIRHAN MİNERAL KATKILAR MÜHENDİSLİK LTD. ŞTİ.

ÇAYIRHAN-ANKARA / TÜRKİYE 2010 – 2011


VAN CEMENT PLANT – 100 T/H CEMENT MILLING PLANT PROJECT

Investor: KONELSIS LTD. ŞTİ.


Yer:

VAN / TÜRKİYE 2009 – 2010


The 28 MW Kepezkaja hydroelectric power plant project

Investor: ICTAS İNŞAAT SAN. TİC. A.Ş.


Yer:

VAN / TÜRKİYE 2010


DAMLAPINAR HYDROELECTRIC POWER PLANT PROJECT WITH A CAPACITY OF 16.40 MW

Investor: ICTAS İNŞAAT SAN. TİC. A.Ş.

KARAMAN / TÜRKİYE 2010


FERNAS PLASTER FACTORY – ADDITIONAL FURNACE PROJECT

Investor: FERNAS İNŞAAT LTD. ŞTİ.

BATMAN / TÜRKİYE 2010


ISAF KUNDUZ DINING HALL BUILDING PROJECT (5000 m²)

Investor: HESA İNŞAAT LTD. ŞTİ.

KUNDUZ / AFGANİSTAN 2009 – 2010


ISAF KUNDUZ DINING HALL BUILDING PROJECT (5000 m²)

Investor: HESA İNŞAAT LTD. ŞTİ.

KUNDUZ / AFGANİSTAN 2009 – 2010


FERNAS CARDBOARD PLANT PROJECT

Investor: FERNAS İNŞAAT LTD. ŞTİ.

BATMAN / TÜRKİYE 2009 – 2010


SOUSSA DESALINATING STATION PROJECT

Investor: ENKA TEKNIK A.S.

SOUSSA / LIBYA 2009


PROJECT OF THE 1ST AND 2ND TECHNOLOGICAL LINES OF THE NATURAL GAS (LNG) LIQUEFICATION PLANT IN YEMEN

Investor: GAMA ENDUSTRI A.Ş.

BALHAF / YEMEN 2007 – 2010


PROJECT OF THE 1ST AND 2ND TECHNOLOGICAL LINES OF THE NATURAL GAS (LNG) LIQUEFICATION PLANT IN YEMEN

Investor: GAMA ENDUSTRI A.Ş.

BALHAF / YEMEN 2007 – 2010


CAPE BODRUM BEACH HOTEL PROJECT

Investor: FERNAS İNŞAAT LTD. ŞTİ.

GÜNDOĞAN-BODRUM / TÜRKİYE 2007 – 2010


FERNAS CEMENT PLANT PROJECT

Investor: FERNAS İNŞAAT LTD. ŞTİ.

BATMAN / TÜRKİYE 2008


AŞKALE CEMENT PLANT 2. CLINKER PRODUCTION LINE AND CEMENT GRINDING PROJECT

Investor: SİNTEK MADENCİLİLİK LTD. ŞTİ.

AŞKALE-ERZURUM / TÜRKİYE 2007 – 2008


KP 114 OIL PIPELINE STATION PROJECT

Investor: FERNAS İNŞAAT LTD. ŞTİ.

QARN ALAM-SAHMAH-HUBARA / OMAN 2008


ISKENDERUN IRON AND STEEL FACTORY – PROJECT 2 STEAM BOILERS WITH A CAPACITY OF 250 TPH (6 AND 7)

Investor: FERNAS İNŞAAT LTD. ŞTİ.

İSKENDERUN/ TÜRKİYE 2007 – 2008


BATMAN 100 MW MOBILE POWER PLANT DISMANTLING PROJECT

Investor: FERNAS İNŞAAT LTD. ŞTİ.

BATMAN / TÜRKİYE 2007


ANKARA FERNAS PLASTER FACTORY (ALL PLASTER) PROJECT 1000 T/G

Investor: FERNAS İNŞAAT LTD. ŞTİ.

GÖLBAŞI-ANKARA / TÜRKİYE 2007


TRAKYA PINARHİSAR CEMENT PLANT PROJECT – DUSTING SYSTEM

Investor: EMF ELEKTRİK LTD. ŞTİ.

PINARHİSAR-KIRKLARELİ / TÜRKİYE 2006 – 2007


MARCH 18 ÇAN THERMAL POWER PLANT – CALCITE GRINDING PLANT PROJECT

Investor: FERNAS INSAAT LTD. ŞTİ.

ÇAN-ÇANAKKALE / TÜRKİYE 2006 – 2007


TOFAŞ CAR FACTORY – D200 LINE PROJECT

Investor: MIKROHOST LTD. ŞTİ.

BURSA / TÜRKİYE 2006 – 2007


NORTHERN MARMARA UNDERGROUND NATURAL GAS STORAGE PROJECT

Investor: FERNAS İNŞAAT LTD. ŞTİ.

SİLİVRİ-İSTANBUL / TÜRKİYE 2004 – 2006


TOKİ 3. SECTION 288 APARTMENTS INFRASTRUCTURE ELECTRICAL WORKS PROJECT

Investor: HATEM İNŞAAT TİCARET A.Ş.

NEVŞEHİR / TÜRKİYE 2005 – 2006


BAKU-TBILISI-CEYHAN (BTC) OIL PIPELINE PROJECT – IPT2 VALVE STATION

Investor: FERNAS İNŞAAT LTD. ŞTİ..

GOLE-KARS / TÜRKİYE 2005 – 2006


BILENRJI- BILKENT VAKIF-MIGROS MEDIUM VOLTAGE SUBSTATION AND SWITCHGEAR DESIGN

Investor: BİLENERJİ A.Ş.

ANKARA / TURKEY 2004


BATMAN FERNAS PLASTER FACTORY (ALL PLASTERS) PROJECT 500T/G

Investor: FERNAS İNŞAAT LTD. ŞTİ.

BATMAN / TÜRKİYE 2004


BOTAŞ DOĞUBEYAZIT NATURAL GAS STATION PROJECT

Investor: TEPE ALT YAPI A.Ş.

KAYSERİ-İMRANLI/ TÜRKİYE 2001


BATMAN 100 MW MOBILE POWER PLANT PROJECT

Investor: FERNAS İNŞAAT LTD. ŞTİ.

BATMAN / TÜRKİYE 2001 – 2002


IDIL-2 MOBILE POWER PLANT PROJECT WITH A CAPACITY OF 20 MW

Investor: TEPE ALT YAPI A.Ş.

İDİL-ŞIRNAK / TÜRKİYE 2001 – 2001

Scroll to Top