OIL, GAS AND MINING

TRANS-ANATOLIAN GAS PIPELINE PROJECT (TANAP), MEASURING STATIONS MS3 AND MS4
Investor: TEKFEN İNŞAAT TESİSAT A.Ş.
ÇANAKKALE-EDİRNE / TÜRKİYE 2018 – 2019
ÇÖPLER GOLD MINE – SULPHIDE EXPANSION PROJECT
Investor: GAP INSAAT A.S. & ANAGOLD MADENCILIK SANAYI VE TICARET A.S.
ERZİNCAN / TÜRKİYE 2017 – 2018


KIRIKKALE 927 MW INDEPENDENT CYCLE POWER PLANT PROJECT
Investor: SAMSUNG C&T CORPORATION
KIRIKKALE / TÜRKİYE 2015 – 2017
WATAN 9E TURBINE POWER PLANT PROJECT WITH A CAPACITY OF 250 MW
Investor: ÇALIK ENERJİ A.Ş.
WATAN / TURKMENISTAN 2015 – 2016


VOLGOGRAD REFINERY – DEEP TRANSFORMATION PROJECT
Investor: YAMATA ENDUSTRIYEL A.Ş.
VOLGOGRAD / RUSSIA 2014 – 2016
TAHA 180 MW COMBINED CYCLE POWER PLANT PROJECT
Investor: BADES ELEKTRİK ÜRETİM A.Ş.
MARDİN / TÜRKİYE 2015


DERWEZE 9E TURBINE POWER PLANT DESIGN WITH A CAPACITY OF 500 MW
Investor: ÇALIK ENERJİ A.Ş.
DERWEZE / TURKMENISTAN 2014 – 2015
TOROS TARIM SULPHURIC ACID PLANT PROJECT
Investor: TEKFEN İNŞAAT TESİSAT A.Ş.
SAMSUN / TÜRKİYE 2014-2015


NAJYBIA 9E 500 MW TURBINE POWER PLANT PROJECT
Investor: ENKA TEKNİK A.Ş.
BASRAH / IRAQ 2014 – 2015
GARDABANİ COMBINED POWER PLANT PROJECT WITH A CAPACITY OF 230 MW
Investor: ÇALIK ENERJİ A.Ş.
GARDABANI / GEORGIAN 2014 – 2015


ERZİN COMBINED POWER PLANT PROJECT WITH A CAPACITY OF 900 MW
Investor: TEKFEN İNŞAAT TESİSAT A.Ş.
ERZİN-HATAY / TÜRKİYE 2012 – 2015
TÜPRAŞ İZMİT REFINERY, FUEL OIL CONVERSION PROJECT (RUP)
Investor: TEKFEN İNŞAAT TESİSAT A.Ş.
İZMİT / TÜRKİYE 2012 – 2014


AL KHAIRAT 9E 1250 MW GAS TURBINE POWER PLANT PROJECT
Investor: ÇALIK ENERJİ A.Ş.
KARBALA / IRAQ 2012 – 2014
NAINAWA 9E 750 MW TURBINE POWER PLANT PROJECT
Investor: ÇALIK ENERJİ A.Ş.
MUSUL / IRAQ 2013 – 2014


WASTE GAS RECOVERY PROJECT AT TÜPRAŞ KIRIKKALE REFINERY
Investor: ACS İNŞAAT LTD. ŞTİ.
KIRIKKALE / TÜRKİYE 2013 – 2014
ALMS MARY-2 110 kV HV CABLE INSTALLATION PROJECT
Investor: ÇALIK ENERJİ A.Ş.
MARY / TÜRKMENİSTAN 2014


GARZAN BİNEK HYDRO POWER PLANT PROJECT WITH A CAPACITY OF 5.6 MW
Investor: FERNAS İNŞAAT A.Ş.
BATMAN / TÜRKİYE 2013 – 2014
DERBANIKHAN 250 MW HYDRO POWER PLANT PROJECT
Investor: LUTHARDT GmbH
SULAYMANIYAH / IRAQ 2013


MELEK GIRLS’ DORMITORY CONSTRUCTION PROJECT
Investor: GENESİS LTD. ŞTİ
ANKARA / TÜRKİYE 2012 – 2013
TÜPRAŞ BATMAN H-509 REFINERY NEW BOILER ROOM PROJECT
Investor: SELNİKEL KLİMA CİHAZLARI A.Ş.
BATMAN / TÜRKİYE 2012 – 2013


SAS/ASAB GAS SEPARATION INSTALLATION DESIGN
Investor: TEKFEN İNŞAAT TESİSAT A.Ş.
ABUDHABI / UNITED ARAB EMIRATES 2011 – 2012
OYAK BOLU CEMENT PLANT – C11035 – BAG FILTER PROJECT WITH A CAPACITY OF 800,000 M3/S
Investor: SİNTEK MADENCİLİK LTD. ŞTİ.
BOLU / TÜRKİYE 2012


DESIGN OF A CLINKER PRODUCTION LINE AT THE VAN 3000 T/D CEMENT PLANT
Investor: FERNAS İNŞAAT A.Ş.
VAN / TÜRKİYE 2011 – 2012
43.40MW GARZAN HYDRO-ELECTRICAL POWER PLANT PROJECT
Investor: FERNAS İNŞAAT A.Ş.
BATMAN / TURKEY 2010 – 2012


TPAO WEST RAMAN GAS COMPRESSOR STATION AND STEAM INJECTION SYSTEM DESIGN
Investor: ATTİLA DOĞAN İNŞAAT VE TESİSAT A.Ş.
BATMAN / TÜRKİYE 2011 – 2012
SAMSUN OMV 870 MW POWER PLANT DESIGN WITH COMBINED CYCLE – WATER TREATMENT SYSTEM
Investor: ENPRODE LTD. ŞTİ.
SAMSUN / TÜRKİYE 2011 – 2012


120 AD GSM ROSHAN TOWER PROJECT AND AWCC
Investor: HESA İNŞAAT LTD. ŞTİ.
KABUL & KANDAHAR & KUNDUZ & MAZAR-E SHERIF / AFGHANISTAN
2010 – 2012
TÜPRAŞ İZMİT REFINERY PROJECT – TEMPORARY FIELD BUILDINGS
Investor: PRİZMA GRUP ENERJİ TAAHHÜT İNŞAAT LTD. ŞTİ.
İZMİT / TÜRKİYE 2011 – 2012


WHR POWER PLANT PROJECT AT AŞKALE CEMENT PLANT WITH A CAPACITY OF 7.5 MW
Investor: YÜKSEL İNŞAAT A.Ş.-TİTANİT LTD. ŞTİ.
AŞKALE-ERZURUM / TÜRKİYE 2010 – 2011
FY 10 AVIATION COMPLEX PROJECT
Investor: YÜKSEL İNŞAAT A.Ş.-TİTANİT LTD. ŞTİ.
MAZAR-E-SHERIF / AFGANİSTAN 2011


FERNAS PLASTER FACTORY – CALCITE GRINDING PLANT PROJECT
Investor: FERNAS ALÇI SANAYİ VE TİCARET A.Ş.
BATMAN / TÜRKİYE 2011
TÜPRAŞ BATMAN REFINERY PROJECT – F101 FOAM UNIT FOR CRUDE OIL PRODUCTION
Investor: AD DEMİREL A.Ş.
BATMAN / TÜRKİYE 2011 – 2012


ÇAYIRHAN ASH GRINDING AND SEPARATION PLANT PROJECT 9 T/H
Investor: ÇAYIRHAN MİNERAL KATKILAR MÜHENDİSLİK LTD. ŞTİ.
ÇAYIRHAN-ANKARA / TÜRKİYE 2010 – 2011
VAN CEMENT PLANT – 100 T/H CEMENT MILLING PLANT PROJECT
Investor: KONELSIS LTD. ŞTİ.
Yer:
VAN / TÜRKİYE 2009 – 2010


The 28 MW Kepezkaja hydroelectric power plant project
Investor: ICTAS İNŞAAT SAN. TİC. A.Ş.
Yer:
VAN / TÜRKİYE 2010
DAMLAPINAR HYDROELECTRIC POWER PLANT PROJECT WITH A CAPACITY OF 16.40 MW
Investor: ICTAS İNŞAAT SAN. TİC. A.Ş.
KARAMAN / TÜRKİYE 2010


FERNAS PLASTER FACTORY – ADDITIONAL FURNACE PROJECT
Investor: FERNAS İNŞAAT LTD. ŞTİ.
BATMAN / TÜRKİYE 2010
ISAF KUNDUZ DINING HALL BUILDING PROJECT (5000 m²)
Investor: HESA İNŞAAT LTD. ŞTİ.
KUNDUZ / AFGANİSTAN 2009 – 2010


ISAF KUNDUZ DINING HALL BUILDING PROJECT (5000 m²)
Investor: HESA İNŞAAT LTD. ŞTİ.
KUNDUZ / AFGANİSTAN 2009 – 2010
FERNAS CARDBOARD PLANT PROJECT
Investor: FERNAS İNŞAAT LTD. ŞTİ.
BATMAN / TÜRKİYE 2009 – 2010


SOUSSA DESALINATING STATION PROJECT
Investor: ENKA TEKNIK A.S.
SOUSSA / LIBYA 2009
PROJECT OF THE 1ST AND 2ND TECHNOLOGICAL LINES OF THE NATURAL GAS (LNG) LIQUEFICATION PLANT IN YEMEN
Investor: GAMA ENDUSTRI A.Ş.
BALHAF / YEMEN 2007 – 2010


PROJECT OF THE 1ST AND 2ND TECHNOLOGICAL LINES OF THE NATURAL GAS (LNG) LIQUEFICATION PLANT IN YEMEN
Investor: GAMA ENDUSTRI A.Ş.
BALHAF / YEMEN 2007 – 2010
CAPE BODRUM BEACH HOTEL PROJECT
Investor: FERNAS İNŞAAT LTD. ŞTİ.
GÜNDOĞAN-BODRUM / TÜRKİYE 2007 – 2010


FERNAS CEMENT PLANT PROJECT
Investor: FERNAS İNŞAAT LTD. ŞTİ.
BATMAN / TÜRKİYE 2008
AŞKALE CEMENT PLANT 2. CLINKER PRODUCTION LINE AND CEMENT GRINDING PROJECT
Investor: SİNTEK MADENCİLİLİK LTD. ŞTİ.
AŞKALE-ERZURUM / TÜRKİYE 2007 – 2008


KP 114 OIL PIPELINE STATION PROJECT
Investor: FERNAS İNŞAAT LTD. ŞTİ.
QARN ALAM-SAHMAH-HUBARA / OMAN 2008
ISKENDERUN IRON AND STEEL FACTORY – PROJECT 2 STEAM BOILERS WITH A CAPACITY OF 250 TPH (6 AND 7)
Investor: FERNAS İNŞAAT LTD. ŞTİ.
İSKENDERUN/ TÜRKİYE 2007 – 2008


BATMAN 100 MW MOBILE POWER PLANT DISMANTLING PROJECT
Investor: FERNAS İNŞAAT LTD. ŞTİ.
BATMAN / TÜRKİYE 2007
ANKARA FERNAS PLASTER FACTORY (ALL PLASTER) PROJECT 1000 T/G
Investor: FERNAS İNŞAAT LTD. ŞTİ.
GÖLBAŞI-ANKARA / TÜRKİYE 2007


TRAKYA PINARHİSAR CEMENT PLANT PROJECT – DUSTING SYSTEM
Investor: EMF ELEKTRİK LTD. ŞTİ.
PINARHİSAR-KIRKLARELİ / TÜRKİYE 2006 – 2007
MARCH 18 ÇAN THERMAL POWER PLANT – CALCITE GRINDING PLANT PROJECT
Investor: FERNAS INSAAT LTD. ŞTİ.
ÇAN-ÇANAKKALE / TÜRKİYE 2006 – 2007


TOFAŞ CAR FACTORY – D200 LINE PROJECT
Investor: MIKROHOST LTD. ŞTİ.
BURSA / TÜRKİYE 2006 – 2007
NORTHERN MARMARA UNDERGROUND NATURAL GAS STORAGE PROJECT
Investor: FERNAS İNŞAAT LTD. ŞTİ.
SİLİVRİ-İSTANBUL / TÜRKİYE 2004 – 2006


TOKİ 3. SECTION 288 APARTMENTS INFRASTRUCTURE ELECTRICAL WORKS PROJECT
Investor: HATEM İNŞAAT TİCARET A.Ş.
NEVŞEHİR / TÜRKİYE 2005 – 2006
BAKU-TBILISI-CEYHAN (BTC) OIL PIPELINE PROJECT – IPT2 VALVE STATION
Investor: FERNAS İNŞAAT LTD. ŞTİ..
GOLE-KARS / TÜRKİYE 2005 – 2006


BILENRJI- BILKENT VAKIF-MIGROS MEDIUM VOLTAGE SUBSTATION AND SWITCHGEAR DESIGN
Investor: BİLENERJİ A.Ş.
ANKARA / TURKEY 2004
BATMAN FERNAS PLASTER FACTORY (ALL PLASTERS) PROJECT 500T/G
Investor: FERNAS İNŞAAT LTD. ŞTİ.
BATMAN / TÜRKİYE 2004


BOTAŞ DOĞUBEYAZIT NATURAL GAS STATION PROJECT
Investor: TEPE ALT YAPI A.Ş.
KAYSERİ-İMRANLI/ TÜRKİYE 2001
BATMAN 100 MW MOBILE POWER PLANT PROJECT
Investor: FERNAS İNŞAAT LTD. ŞTİ.
BATMAN / TÜRKİYE 2001 – 2002


IDIL-2 MOBILE POWER PLANT PROJECT WITH A CAPACITY OF 20 MW
Investor: TEPE ALT YAPI A.Ş.
İDİL-ŞIRNAK / TÜRKİYE 2001 – 2001